Tampere price list 2026
Usage and basic fees
Usage fees
| EUR/m3, VAT 0 % | EUR/m3, VAT 25,5 % | |
|---|---|---|
| Water | 1,54 | 1,93 |
| Waste water | 2,68 | 3,36 |
| In total | 4,22 | 5,30 |
Basic fees
| Water | Water | Wastewater | Wastewater | |
|---|---|---|---|---|
| Meter size mm | EUR/month, VAT 0 % | EUR/month, VAT 25,5 % | EUR/month, VAT 0 % | EUR/month, VAT 25,5 % |
| ≤ 20 | 9,51 | 11,94 | 10,43 | 13,09 |
| ≤ 30 | 39,77 | 49,91 | 44,40 | 55,72 |
| ≤ 40 | 100,03 | 125,54 | 109,69 | 137,66 |
| ≤ 50 | 136,98 | 171,91 | 150,21 | 188,51 |
| ≤ 80 | 173,94 | 218,29 | 190,73 | 239,37 |
| ≤ 150 | 208,01 | 261,05 | 228,11 | 286,28 |
In addition to the basic fee, a fee of EUR 1,67 m3 + EUR 0,43 (VAT 25,5%) = EUR 2,10/m3 will be charged for temporary water, measured with a temporary water meter or according to the estimated use.
If a fire hydrant meter has been damaged during use, the repair costs of the meter and the final readings of the meter plus 100 m3 as a usage fee will be invoiced.
Connection fee
A connection fee will be charged when a new building is connected to the water supply and/or sewer network. The amount of the fee is dependent on the type of the property and permitted building volume. You can request a connection fee calculation from our customer service, tel. +358 40 806 2747 or vesi.karttapalvelu@tampere.fi.
The connection fee is charged according to the currently valid price list at the time of conclusion of the water agreement. Value added tax will be added to the price (25,5 %).
For example, for a detached house under 250 m², the connection fee for water is €2,700.00 (VAT 0%) = €3,388.50
(including 25.5% VAT), and for wastewater €2,700.00 (VAT 0%) = €3,388.50 (including 25.5% VAT), making a total of €5,400.00 (VAT 0%) = €6,777.00 (including 25.5% VAT).There is a calculator for calculating the average connection fee available on the Tampere Water website. Calculators are currently only available in Finnish.
In addition to the connection fee, the property owner is required to cover the cost of building the service pipes.
The prices for construction of the service pipes
-
EUR/month, VAT 0%, EUR/month, VAT 25,5 % Service lines 3300,00 4141,50 -
If service lines have not been installed up to the water meter during new construction, the property owner may have them installed by Tampere Water based on a quotation or arrange for another contractor to carry out the work.
Service lines must be constructed in accordance with a written and approved quotation.
Excavation work for water and sewer lines is performed by the builder’s contractor.
Connection work to the main network and to the property’s internal water supply network is always carried out by Tampere Water as a chargeable service.
EUR/month, VAT 0 % EUR/month, VAT 25,5 % On-site service pipe ø 40 HDPE 2100,00 2635,50 Other diameters price on request The construction price of the plot water pipe includes: a tapping saddle/T-branch, valve, valve cover, 30 meters of water pipe, water meter fittings, water meter, and installation work (4–8 hours). The relocation of the water pipe within the property to the water meter is not included in the rate.
The construction price of the sprinkler pipe includes: a T-branch, 3 valves, valve covers, 30 meters of water pipe, connection fittings, and installation work (8–12 hours).
-
EUR/month, VAT 0 % EUR/month, VAT 25,5 % On-site water service line (ø 40 mm) 1500,00 1882,50 Other diameters price on request -
EUR/VAT 0 % EUR/VAT 25,5 % drilling a hole and a seal ( ø 110–315 mm) 310,00 389,05
Water meter fees
-
Meter size mm EUR/month, VAT 0 % EUR/month, VAT 25,5 % ≤ 20 3,00 3,77 ≤ 30 4,00 5,02 ≤ 40 6,00 7,53 ≤ 50 7,00 8,79 ≤ 80 9,00 11,30 ≤ 150 12,00 15,06 -
EUR/month, VAT 0% EUR/month, VAT 25,5 % Data transfer fee (monthly) 3,50 4,39 -
A verification fee is charged for a check requested by the customer if the meter is found to be accurate. The fee includes material costs according to the meter size.
Meter size mm EUR/month, VAT 0% EUR/month, VAT 25,5 % < 30 440,00 552,20 ≤ 50 930,00 1167,15 ≤ 150 1570,00 1970,35 -
EUR/month, VAT 0 % EUR/month, VAT 25,5 % Opening or closing a service pipe *) 250,00 87,85 Water meter works, including meter removal, meter reading, retrieval of meter from winter storage, and installation of winter storage meter **) 250,00 87,85 Compensation for a lost water meter 420,00 – 2870,00 527,10 – 3 601,85 Compensation for other lost or damaged water supply products, € / unit 700,00 878,50 *) A visit or disconnection carried out as a collection measure: €125 + VAT 0%, and reconnection: €125 + VAT 25,5%.
**) For services performed outside normal working hours, a multiplier of 2 is applied.
Sewer maintenance service fees
-
EUR/VAT 0 % EUR/VAT 25,5 % Hourly rate, incl. two employees 157,00 197,04 Work done outside normal operating hours (4p.m. to 10 p.m.) 192,00 240,96 Work done outside normal operating hours (10 p.m. to 7 a.m.) + weekends and public holidays 226,00 283,63 The minimum charge is one hour, billing is done with an accuracy of half an hour. The service prices include transportation to the waste processing site.
Other fees
-
Supply water quantity provision l/s EUR/month, VAT 0 % EUR/month, including VAT 25,5 % less than 5 20,40 25,60 5…10 33,30 41,79 10…19 44,40 55,72 20…30 66,60 83,58 more than 30 111,00 139,31 -
EUR/month,
VAT 0 %
EUR/month,
VAT 25,5 %
Office services (h) 52,00 65,26 Installer (h) 70,00 87,85 Supervisor (h) 90,00 112,95 Expert services (h) 100,00 125,50 Additional visit (unit) 300,00 376,50 The minimum charge is one hour, with billing in 30-minute increments.
An additional visit refers to a charge, for example, if an agreed connection work is canceled due to an excavation that does not comply with instructions.
For work performed outside normal working hours, a multiplier of 1,75 is applied between 16:00 and 22:00, and a multiplier of 2 is applied between 22:00 and 07:00, as well as on weekends and public holidays.
-
The prices reflect any adjustments in the billing of Pirkanmaan Jätehuolto Oy